Van Stadens

Work 2020.08.07

The ladies toilets cistern were not working properly and Mr Forlee had time today to come and fix them so we needed to go out as well. Apart from discussing the toilet problems with him we also managed to do the following: Replaced the wires under the soil in the misting house which meant removing […]

Work 2020.08.07 Read More »

Pump at last

After all the wiring and the first test run last week it needed a small change to the Raspberry program to make the pump controller live. It was quite nerve wracking to have set it for 10 o’clock and having to wait and it was a relief that it worked flawlessly. In the meantime Jenny

Pump at last Read More »

The Hide–Assembly

2018.04.14 The final two trips to get everything to the reserve. First the side walls and the roof sections. and then the most important bay window. As I had excruciating back pain and Ellie was still recovering from her fall off the platform we relied on our fellow Fovs members and it was great to

The Hide–Assembly Read More »

January 2018

We had a good start to 2018, the reserve is recovering very well after the fire with many unusual plants and flowers to be discovered and admired.There is now a spiffy new welcoming sign at the entrance circle and the ranch poles had a fresh coat of paint, looking great!We asked for a long time

January 2018 Read More »

New signs

It has taken a while to come up with a new type of signs which don’t cost an arm and a leg and finally I used some old sprinkler pipe from the nursery and some sheeting from an old air conditioning duct and came up with something acceptable. Here are some others: The pebbles on

New signs Read More »